BGI CONSTRUCTION UPDATES

(Click on thumbnail for a larger view)

 

WE HAVE MOVED IN ! - UPDATED PICTURES COMING SOON

 

 

October 25, 2007

Finishing touches being worked on.  First crop (Easter Lilies) planted at new facility.  Office move set for Nov 1 and plants start moving week of Nov 5.

100_5642.jpg (414079 bytes) 100_5695.jpg (328038 bytes) 100_5669.jpg (358880 bytes) 100_5648.jpg (298756 bytes)

 

September 1, 2007

Progressing very well.  Final Heat Piping is being completed and wrapped with insulation.  Dry walling has started in the offices.  Shade cloth is being installed.  The move should start this month.

100_5211.jpg (582805 bytes) 100_5216.jpg (390377 bytes) 100_5222.jpg (480411 bytes)

 

August 17, 2007

Progressing well.  Heat exchangers are being connected at the Waste Management plant.  Greenhouse structure completely covered.  The first eight houses should have concrete floors completed by 8/26/07.  Drywall scheduled in be installed in headhouse this week.  Electricians are on site.

100_5074.jpg (1072335 bytes) 100_5086.jpg (1004950 bytes) 100_5099.jpg (481924 bytes) 100_5042.jpg (469642 bytes)

 

 

July 10, 2007
Progressing well.

 

100_4388.jpg (312034 bytes) 100_4751.jpg (432680 bytes) 100_4766.jpg (567694 bytes)

 

June 8, 2007
Aerial photos taken on June 8th

 

Aerial_5803.jpg (658524 bytes) Aerial_5813.jpg (663209 bytes) Aerial_5831.jpg (765530 bytes)

 

 

June 4, 2007

The Greenhouse is going up, Hot Water Pipes are being run from Waste Management and the Headhouse structure is nearing completion.

 

100_3921.jpg (568942 bytes) 100_3956.jpg (404920 bytes) 100_3994.jpg (466063 bytes) 100_3995.jpg (447788 bytes) 100_4003.jpg (466540 bytes)

 

 

May 18, 2007

Most of the Greenhouse post pins have been set and construction will start soon.  The Headhouse is going up well.  The installation of the hot water pipes from Waste Management will start around 5-23-07.

 

100_3757.jpg (493534 bytes)

100_3798.jpg (466645 bytes) 100_3802.jpg (439960 bytes) 100_3809.jpg (458039 bytes)

 

 

 

April 29, 2007

The Waste Management Engines we are going to get our heat from have been delivered.  The Greenhouse site is still being prepared.  Headhouse heat tubes were installed and the floor has been poured. The Headhouse has been delivered onsite and construction should start on 5/7 and the greenhouse the following week.

 

100_3363.jpg (410302 bytes) 100_3393.jpg (566647 bytes) 100_3418.jpg (574041 bytes) 100_3490.jpg (417737 bytes) 100_3545.jpg (384119 bytes) 100_3597.jpg (364420 bytes)

 

 

April 13, 2007

Greenhouse site is being prepared.  Pre-assembling is being done for the greenhouse structure.  Headhouse drains have been roughed into the headhouse and the floor should be poured soon.  The project should start going vertical very soon.

 

100_3161.jpg (468333 bytes)

100_3197.jpg (554311 bytes)

100_3224.jpg (413602 bytes)

 

March 12, 2007

Weather is getting better.  Pouring foundation walls for headhouse and loading docks.  Finishing the road behind the headhouse.

 

100_2793.jpg (408456 bytes) 100_2800.jpg (358076 bytes) 100_2803.jpg (408573 bytes)

 

March 4, 2007

It has still been very wet.  We are suppose to get some dry and warmer weather the week of 3/5.  Hope to get the foundation poured and start preparing greenhouse site.  

100_2704.jpg (1094804 bytes)

January 23 - 28, 2007

Poured some footings for the headhouse.  Loading Docks are formed. Road almost finished.

 

100_2613.jpg (525442 bytes) 100_2619.jpg (535070 bytes) 100_2624.jpg (513673 bytes)

 

January 19, 2007 thru January 22, 2007

We have had a lot of rain, snow and sleet this winter so progress has been a little slow to this point.  The access road is 80% completed.  The parking area has been excavated and rocked.  The steel building contractor has spread the rock under the steel building (headhouse) and have begun digging footings.  Hoping for some dry weather to start excavating the greenhouse area to have it ready for the greenhouse contractor by mid February.

 

100_2547.jpg (452547 bytes) 100_2550.jpg (489757 bytes) 100_2556.jpg (521000 bytes) 100_2559.jpg (477428 bytes) 100_2578.jpg (465597 bytes)

 

January 3, 2007 thru January 13, 2007

Making Progress on Road and MORE ice.

 

100_2459.jpg (479167 bytes) 100_2462.jpg (455571 bytes) 100_2472.jpg (413440 bytes) 100_2520.jpg (447368 bytes)

 

December 22, 2006

Starting to spread rock on access road. Rain rain go away !

 

100_2453.jpg (490624 bytes) 100_2456.jpg (449621 bytes)

 

December 19, 2006

First ground Breaking !!

 

100_2447.jpg (415778 bytes)

 

December 13, 2006

Meeting of the minds..Clear slate..

 

100_2419.jpg (549042 bytes) 100_2417.jpg (456674 bytes)

 